Solution overview

Solar energy solution

Rooftop photovoltaic (PV) modules convert sunlight to direct current (DC). An inverter converts DC to alternating current (AC) for the site electrical system. For grid-connected self-consumption, the overlap between generation and demand matters. Storage and backup can be evaluated against the site's load requirements.

Problems and needs

  • Monthly consumption totals alone do not show when site loads can use solar generation. Review interval demand.

  • Roof structure, shading, maintenance access and interconnection conditions constrain array size.

  • When collecting data from multiple devices, define metering points, data interfaces and who responds to alerts.

How it works

  1. 1

    PV modules generate DC in daylight. Output varies with irradiance, temperature and shading.

  2. 2

    The inverter converts DC to AC. On-site loads consume locally generated power when generation and demand coincide.

  3. 3

    Meters and a data gateway record generation and equipment status. Review trends and alarms to plan inspection, cleaning or maintenance.

System architecture (conceptual)

  1. PV array · DC
  2. Inverter · DC → AC
  3. Distribution & metering · AC
  4. On-site loads

Conceptual diagram only; a real design depends on each project.

System components

  • PV modules and mounting designed for roof loads, wind and site conditions.
  • Inverters, cabling, distribution and protection specified in the approved design.
  • Metering, data gateway and monitoring platform matched to the selected equipment interfaces.
  • Storage and compatible controls if the design calls for energy shifting or backup.

Benefits

  • Use on-site generation for loads that run during daylight.
  • Prioritize maintenance using production data and alerts.
  • Use measured operating data to assess future expansion or storage.

Use cases

  • Factories draw power during production and ventilation hours. Compare interval loads with seasonal generation estimates.

  • Warehouses and logistics sites may have large roofs and low weekend demand. Check self-consumption and surplus options.

  • Commercial buildings can track PV generation alongside site consumption to see when individual loads can use it.

Hoang Phuc Corp catalog

Suitable products

Products in the real Hoang Phuc Corp catalog that can be used in this solution. Suitability is cross-checked against published specifications; items labelled “Technical confirmation needed” require further consulting.

  • Technical confirmation is required before deployment.

    V5624G Enterprise-class Standalone Switch

    Product code V5624G · DASAN

    128Gbps switching capacity 24 1GbE(Combo) + 4 10GbE(SFP+) 2 ports for stacking Support Dual power supplies for Redundancy Hot…

    Why it fits

    A candidate for indoor IT aggregation when the monitoring gateway has a suitable Ethernet interface. The catalog lists 24 combo 1GbE ports and four 10GbE SFP+ uplinks for the LAN. Confirm the gateway interface, transceivers, installation environment and network segmentation.

    View details →

Discuss connectivity with Hoang Phuc

If the site already has a gateway and needs to bring data onto the LAN, share the network diagram, metering point count, link distances and interface documentation with Hoang Phuc. Comparing these requirements with the network catalog helps identify candidate equipment and what the project engineer needs to verify.

Reference implementation process

Generic reference steps; not a delivery commitment nor a description of an executed project.

  1. 1

    Collect interval load profiles, seasonal bills, the existing electrical diagram and self-consumption or backup objectives.

  2. 2

    Survey roof structure, waterproofing, shading, cable routes, electrical rooms and maintenance access.

  3. 3

    Confirm interconnection, fire safety, surplus generation and site requirements with the relevant parties before final design.

  4. 4

    Verify meter, inverter and gateway interfaces. During commissioning, check metering, alerts and handover documentation.

FAQ

Can the system operate during a utility outage?

Backup depends on an inverter designed for islanded operation, appropriate transfer equipment, storage configuration and a suitable protection design.

What should I prepare for a discussion with Hoang Phuc?

Share the site network diagram, IT cabinet locations, connection distances and gateway interface documentation for a review of monitoring connectivity.

Need solution consulting?

Send your requirements and the Hoang Phuc Corp team will advise on a suitable configuration and products.

Contact usCall now 0919 235 568